Hi CCC
Perhaps I should elaborate on current plans in the SuperPAK at the moment:
We are looking at adding as many weapons/aircraft/ships/theatres etc as we are provided with (I'll call them entities from now on) into an expandable master database. The theory is that theatre creators (and I'm still one of them

) essentially filter the required entities for their desired era/location. A good example is we have pretty much all the F16 variants in the master entity database but as a theatre developer I only use say the Block 40/42 for Desert Storm.
One of the key priorities is to put as much modularity back into the sim as this IMO was the core design goal of the VU2 engine but MPS screwed it up with a non-modular (or half modular at best) User Interface.
Not surprising that Jerry (I hope) will be a key player in this work.
I guess the bottom line is that we are not excluding anybody's work and because the agreement mentions Korea specifically it doesn't get any special favours other than it was the default theatre shipped with Falcon4.
Hope that helps.
Chris "Washout" Carter
F4SuperPAK Management
CO: The Vulture Squadron
I think you have to ask yourself whether I would have got involved in SuperPAK if I was going to have to place the Balkans at the bottom of my priorites
